What is meant by verbose=10 on cross validate?

613 views Asked by At

I'm running a model with differential evolution to minimize the cross validate score I set verbose=10 in order to get an idea about how long that will take then I'm getting the messages below:

enter image description here

But I don't got any idea what that means. Why is remaining time increasing?

0

There are 0 answers