Upsource external links behaviour

238 views Asked by At

I have two projects in our team upsource. They are set up in the same way. And I set external link at both projects like this external links setup

In both projects PyCharm detects these links and they acts like links that lead to our redmine (but I need to scroll to right if I want to see that links) detected links

But, problem is, that only in one project Upsource creates a discussion where it writes some "explanation" with link explanation with link

This explanation discussion very helpful, because I can see link in discussion list instead of scroll commits list to right. How can I set same behaviour to all my projects?

1

There are 1 answers

0
Maxim On

Upsource automatically adds the "explanation" comment, when a review is created from a commit with a long message. Normally, the whole commit message gets into a review title, but when it's too long, only the first line is taken. To avoid any confusion, the message is posted inside as an "explanation" discussion.